<legend id="zxakg"><li id="zxakg"></li></legend>

<sub id="zxakg"></sub>

  1. 国产亚洲精品日韩综合网,免费视频成人片在线观看,香蕉视频在线观看黄,国产精品视频一区二区猎奇,爆乳熟妇一区二区三区,最新中文字幕av无码专区,最新国产精品亚洲二区,国产精品人一区二区三区
    Your current location:Home -News -Industry news
    Industry news

    Key to hot runner system selection

    Date:2023-04-07View:9651

    A successful hot runner system mold application project requires several steps to ensure:


    1. Select the right hot runner supplier. As a plastic mold factory and plastic products injection factory, plastic products from which aspect? What about the mold structure? Mold and plastic products batch size, production efficiency, maintenance is to choose which supplier to consider.


    One is to choose manufacturers with rich experience and technical expertise in hot runner, because in the case of more mature mold manufacturing, the design and manufacturing capacity of hot runner determines the success of mold testing. The second is to choose companies with economies of scale, where all manufacturing processes are completed and the work of providing support services to users is more complete. Both need to be combined to better serve users.


    2. Correct selection of hot runner scheme. Plastics in the hot runner system to average the temperature, so that the flow to balance, hot runner companies use heat balance and mold flow analysis software is essential, at the same time to take into account the relevant mold manufacturing and injection molding experience, so that defects early to understand, early to overcome. For example, which heating method is adopted, whether the heat distribution is balanced, flow path, flow path size, heat insulation and cooling, whether there is interference in the oil and gas passage, whether the gate is reasonable and so on, can reduce the number of mold testing, more can reduce the cost of mold testing.


    3. Whether the hot runner material is the correct remedial measure. In plastic materials with different characteristics and different mold structures, the company's own materials are also important, because in addition to heat transfer balance, the design of the hot runner, but also good insulation, plus whether to ensure high speed, high pressure, high temperature and corrosion resistance factors to consider.


    4. Whether the hot runner treatment is accurate or not. The hot runner system is a combination, which requires high machining accuracy of various accessories and has optional interchangeability, so the machining accuracy must be standardized. Diverter plates require high parallelism, smooth passages, balanced passages without dead angles. There are special requirements for the concentricity and perpendicularity of the hot tip. The matching requirements of the needle and sleeve are also quite accurate and standardized.


    5. Whether the mold processing is accurate. The mold and the hot runner part of the installation and processing accuracy requirements of coordination, hot tip seal position, template parallelism, the surface of the cylinder hole, must ensure the machining tolerance range, and in the future to carry out multiple mold maintenance can also ensure deformation, while avoiding the protection of space heat and temperature line.


    6. Whether the hot runner can be properly maintained and maintained. In some fire protection materials of plastic injection molding, such as the down time more than half an hour, had better set the hot runner temperature below the melting temperature, if plastic injection molding and carbide with corrosion easily, you need to stop to repair the mold or mold, injection molding machine and hot runner injection molding to clean, had better use the normal plastic injection moulding machine washing cylinder and hot runner, after being completely remove the new material will be down from the plane of injection moulds. If it is not easy to change the color of the hot runner from the dark color, the light colored plastic of the machine can also be injected into the cylinder and hot runner before the mold, until the lighter material is injected, and then the mold is formed on the machine to remove the hot runner cleaner.

    主站蜘蛛池模板: 日本国产精品第一页久久| 国产又色又爽又黄的网站在线| 久久综合九色综合欧洲98| 久久久久国产精品人妻照片| 无码免费午夜福利片在线| 99久热re在线精品视频| 中文字幕无线乱码亚洲观看| 日本中文字幕一区二区三| 精品国产高清自在线一区二区| 国产女精品视频网站免费蜜芽| 小sao货边洗澡边cao你动漫| 在线精品视频一区二区三区| 欧美视频专区一二在线观看| 日本怡春院一区二区三区| 国产午夜福利小视频在线| 国产在线视精品在一区二区| 国产女女精品视频久热视频| 美女被躁出白浆视频播放| 久久中文字幕综合不卡一二区 | 国产精品久久久久这里只有精品| 国产成人精品日本亚洲直接| 欧美人和黑人牲交网站上线| 精品 日韩 国产 欧美 视频| 2020国产精品自拍| 亚洲区一区二区三区精品| 国产成人拍国产亚洲精品| 最新国产网站| 国产精品激情av在线播放| 国语偷拍视频一区二区三区| 久久成人国产精品无码| 丁香五月亚洲综合深深爱| 最新国产精品好看的国产精品 | 小泽玛莉亚一区二区视频在线 | 国内精品自产拍在线观看| 东北妇女精品bbwbbw| 亚洲av无码专区国产不卡顿| 一区二区三区毛aaaa片特级| 国产精品无码久久久久久| 久久大香香蕉国产免费网站| 午夜性影院在线观看视频播放| 国产精品久久国产精麻豆99网站|